Clouds

We value projects of all types:

Our Experience Includes:

Project Highlights


Atlantis Phase II

Atlantis Phase II is a Hotel, Resort and Casino project encompassing 1.5 millions square ft. of occupied space. The HVAC system includes a 4,500-tons Central Plant Chiller Plant, 62 Air Handling Units systems and 1500 fan coil units. We have been working in the Bahamas since 1997, then in 2000 a local company was formed to perform joint ventures with a Mexican company in the development of Atlantis projects Phase II.

Atlantis Phase III

Atlantis Phase III is a Hotel, Resort and Casino project encompassing 250 thousand square ft. of occupied space. This phase have 1,000 rooms. The HVAC system includes a more of 7,000-tons. HVAC system central plant and 1200 HP boilers.

The Phase III expansion includes: the luxurious 600-room resort within the resort, The Cove Atlantis; a 497-key condo-hotel, The Reef Atlantis; a 14-acre dolphin habitat and education center, Dolphin Cay; a 63-acre addition to the waterscape, now called Aquaventure and a total of 140 acres; Aura, a nightclub. and the 30,000 square-foot flagship Mandara Spa.

Bahamar (1998–2003)

Complete remodeling of the Sheraton Hotel (previously The Radissson), we were also contracted by this firm to do the HVAC installations for the remodeling of Tower “C”, phase I in the Wyndham Hotel, as well as the remodeling of Towers “H” and “M”, Phase II also in the Wyndham Hotel and replacement of the pumps.

Albany Project (2010)

Albany has been designed for superb experiences for all ages and pursuits. A mega-yacht marina, an 18-hole championship golf course, a full-service SPA and fitness center, casual and fine dining restaurants, seaside bars, a family water park, a kids’ clubhouse and an adult pool and lounge are among the exceptional amenities families can enjoy at Albany.

We contracted by Albany’s Family Water Park, fitness center, Cottages, Building B.



Our extensive list of clients and projects continues to grow